Project features:
-
1.5 MWp FPV system
-
3,744 installed solar modules
-
1,315m Mooring Line
-
9 anchors
-
Underwater anchoring
​Blue C engineering:
-
Site assessment and estimation of directional wind and wave parameters for the local environmental conditions
-
Simulation of dynamic loads and structure response of coupled FPV elements and the total FPV system for various mooring line arrangements and anchor positions
-
Prediction and evaluation of directional FPV system displacements and load distribution of the anchors considering high and low water levels.
-
Design and dimensioning of mooring components based on load combinations according to valid and local standardization