Sellingen, The Netherlands
Project features:
-
41.10 MWp FPV system
-
76,616 installed solar modules
-
2,549m Mooring Line
-
100 anchors
-
Underwater anchoring
​Blue C engineering:
-
Site assessment and estimation of directional wind and wave parameters for the local environmental conditions
-
Simulation of dynamic loads and structure response of coupled FPV elements and the total FPV system for various mooring line arrangements and anchor positions
-
Prediction and evaluation of directional FPV system displacements and load distribution of the anchors considering high and low water levels.
-
Design and dimensioning of mooring components based on load combinations according to valid and local standardization