Tynaarlo I + II, The Netherlands

​Project features:

  • 15.0 MWp FPV system

  • 39,850 installed solar modules

  • 5.426m Mooring Line

  • 68 anchor

  • Onshore and underwater anchoring

​Blue C engineering:

  • Site assessment and estimation of directional wind and wave parameters for the local environmental conditions

  • Simulation of dynamic loads and structure response of coupled FPV elements and the total FPV system for various mooring line arrangements and anchor positions

  • Prediction and evaluation of directional FPV system displacements and load distribution of the anchors considering high and low water levels.

  • Design and dimensioning of mooring components based on load combinations according to valid and local standardization